Status: Development
Type:
Offered at: $ 0
Bathrooms: Bathrooms
Bedrooms: Bedrooms
MLS #
Web site: http://www.garibaldiatsquamish.com/
Coming Soon
To ensure Full Buyers Representation register thru Joanne
Over the proposed fifteen-year project development, Garibaldi Resort will construct accommodations totaling 22,846 bed units.
The resort will create over 13,000 direct jobs and over 5,000 indirect jobs during construction. Another 2,400 direct jobs will be created during operations.
Garibaldi Resort is proposing a skier capacity (CCC) of 15,250.
The area proposed to encompass the skiing/snowboarding terrain covers 1,850 hectares within a parent parcel totaling 3,238 hectares as stipulated in the guidelines.
Total vertical drop from the top of Lift Q (highest elevation) to the base of Lift A is 1,215 metres (3,986 feet).
Proposed lifts include:
2 enclosed gondolas, 1 cabriolet gondola, 12 detachable chairlifts, 5 fixed grip chairlifts, 3 real estate fixed grip access lifts and 2 surface lifts.
In addition to alpine skiing, the mountain development area will be used for Nordic skiing and snowshoeing in the winter, and lift rides, hiking, interpretive trails, site-seeing, mountain biking, horseback riding, dining, festivals and events, etc. during the summer.
Trail networks include loops on the top of the mountain, taking advantage of the scenic views and gentle slopes of Brohm Ridge.



